At DPSS we are very proud of our high standard and quality of work. Here are some photos of completed projects Greenwich Power StationDPSS designed and installed the new CMS routes, new Switchgear, Power, Comms and Fibre Cables and new Cabinets for the modernisation of the pumping system at Greenwich Power station. This project took 4 months to complete.
Illuminated Signage Installation
Installation of Illuminated signage equipment across 19 Piccadilly Line Stations to allow the new longer Piccadilly Line Train stock to safely stop at the existing subsection platforms.