Earls Court THID

DPSS were awarded a contract for the design, construct and installation of a Ticket Hall Information Display Unit (THID) at Earls Court Station. The THID needed to be mounted on Platform 3/4 and at a high level to allow Passengers to view it from along the platform and the passenger walkway. DPSS  designed the Stainless […]Read More »

Zero Waste

  DPSS are now working towards Zero Waste!   This means we will aim to reuse & recycle everything we possibly can and where we can’t we will send the waste to an “Energy from Waste” Plant.   LULs corporate target is for 99% of waste to be diverted from Landfill. DPSS are helping to […]Read More »

Stairclimber

DPSS Cabling Services Limited are specialists in the safe delivery of large pieces of equipment by utilising an LUL approved Power Mate Safety Moving System.   If you require this services please get in touch we would be happy to assist.Read More »

DPSS have been busy....

DPSS have been very busy in the office putting tenders and prices together for future works, some of the works we have been doing out on site are as follows: SWIP Tranche 2 Installs at various sites across London Underground Walthamstow Central CCTV upgrade works Firstco Greenwich Power Station installation works Cubic SC3 Ticket machine […]Read More »

DPSS Summer Event

A few weeks ago the staff at DPSS attended a Summer Event at the Crazy Bear in Stadhampton…. The day involved axe throwing, knife throwing, archery, crossbows, air rifle shooting, hand gun shooting and clay pigeon shooting. A good day was had by all, the MDs wife took the award for most axes hitting the […]Read More »

Project Focus - Next Train Indicators

Project Title: Next Train Indicators Sites: Southfields, Wimbledon Park, Putney Bridge, West Brompton & Seven Sisters Client: Station Works Improvement Program & TFL Duration: November 2014 to May 2015 Description: DPSS surveyed all 5 sites and carried out Structural Assessments prior to producing a Conceptual Design Specification document for LUL Asset Engineers Approval. A Total […]Read More »

Lillie Bridge Depot Lighting

DPSS were employed to install the new Pathway Hendal Lighting across the Lillie Bridge Depot Site including the main shed, and the Tripcock lighting for the train crew walkways. In total DPSS have installed over 300 lights!    Read More »

OPO Mirror Removal

DPSS have been removing the one person operation mirrors at Wembley Central, these were used by drivers to check all passengers had boarded the train safely. Nowadays train drivers have cameras and monitors to do the job. Once the mirror had been safely removed we set about covering the gap with a replacement concrete slab.Read More »