At DPSS we are very proud of our high standard and quality of work.
Here are some photos of completed projects
Arch 99 Woodlane Station
Costain selected DPSS to design and install CMS within Arch 99 at Wood Lane. The installation called for access to the Trackside Hanger Routes and DPSS proposed the split duct system up and over the parapet wall rather than drilling directly through the cess into the Arch. This traywork allows transition between the Hammersmith & City Line and the Central Line below, leaving adequate space for remake loop for fibre and copper data cabling.