LVAC Cable Pull – Uxbridge

As part of the dual power SER upgrades DPSS were tasked by Amco Giffen with the survey, route design and installation and commissioning of the SWA supply cables for various stations across the network. This ranged from 90mm 4 core right up to 300mm 4 core SWA.

At Uxbridge Station DPSS installed a 120mm 4 Core along with a 95mm CPC Earth cable. Because of the distances the cable needed to run we also performed mutliple joints.

Warehouse Lighting

DPSS have recently completed the installation of 72 High Bay lights and new Distribution Board at a brand new Warehouse in Heathrow, London.

All cables, CMS, Bracketry & Lights were installed on time and within budget for the client., glanding, terminating & testing completed too.

Our lead Level 4 Electrician,  City & Guilds 2396 Design & Verification qualified & BTEC Level 4 HNC Diploma in Construction and the Built Environment,  desiged the contactors layouts and lighting circuits for the client. A new DB was also installed to support the lighting circuits.

The guys at DPSS have enjoyed working on a different project during the COVID-19 Pandemic. To ensure their safety they have their temperature taken before starting on site and wear masks to protect themselves and others.

 

4

5

3

2

1

6