DPSS installed the trial PTI CAMs at Victoria Station as part of a safety trial of a camera system to detect passengers accessing the track.

Design, survey and installation of cabling
The Luton DART is an under-construction automated guided people mover which will connect Luton Airport Parkway station and Luton Airport in England. Construction began April 2018 and it is due to be open for service in 2022.
DPSS were tasked with the installation of the Control Wiring for the Luton DART.
DPSS have recently completed the installation of 72 High Bay lights and new Distribution Board at a brand new Warehouse in Heathrow, London.
All cables, CMS, Bracketry & Lights were installed on time and within budget for the client., glanding, terminating & testing completed too.
Our lead Level 4 Electrician, City & Guilds 2396 Design & Verification qualified & BTEC Level 4 HNC Diploma in Construction and the Built Environment, desiged the contactors layouts and lighting circuits for the client. A new DB was also installed to support the lighting circuits.
The guys at DPSS have enjoyed working on a different project during the COVID-19 Pandemic. To ensure their safety they have their temperature taken before starting on site and wear masks to protect themselves and others.