Westfield Tunnel Control Panels
DPSS were appointed by Westfield to install New 3 phase Switchgear for both the Tunnel Lighting and Power between the Wood Lane sidings and White City Station, both roads, including the Override Switches mounted on the East End of each platform of White City Station. All works, materials and equipment were installed to meet LUL Standards and specification and complying with BS7671, completed within programme and budget.